Installation of Rapid Gravity Filters at Majis’ RO Plant
Description
Fabrication, installation, and testing of FRP Underground and Above Ground Piping, as well as civil excavation and backfilling. | Services - Waste Water, Flush Water and Brackish Water | Vendor - EPP India | Piping Material - GRE | Joint Type - Lamination Joints | Hydrotest Pressure - 4 Bar.
Project details
- LOCATION: Sohar Industrial Port
- SCOPE : FRP Under Ground and Above Ground Piping - 11,600 Inch Dia. Civil Excavation - 5000 Cu.M.
- CONTRACTOR: Toshiba Water Solutions Private Limited
- SUB-CONTRACTOR: Abdul Hakeem Al Balushi Trad. (AHAT)
- PROJECT DURATION: Feb 2021 - Sep 2021
- TOTAL MANHOURS: 1,00,000














